How long does it take to install a large structure tent?
A 10 m × 40 m structure tent secured with concrete expansion anchors typically takes about two days to install on site. The installation crew spends about one day anchoring the legs and assembling the frame, and another day installing the roof cover and sidewalls.
Installation time depends on the tent size, the anchoring method, and whether the tent includes sidewalls or glass walls.
When requesting a quote, please share the earliest date our crew can access the site or the date installation must be complete. This helps us estimate material preparation time and schedule the installation.